Archive for Shunterspot forum Interactive forum for those interested in locating and photographing UK shunters
 


       Shunterspot forum Forum Index -> Corrections and Updates
concrete bob

09021

Has left Immingham by road and deposited at Booth's on the 24 July, for disposal. It will be the first 09 to be cut up.
royalred

I'm surprised none of the shunter hire companies are interested in the class 09?? Having declined 09 004, 025 and now 021!
concrete bob

On site at Booth's, 09021 was scrapped on the 26th July.
Pumlumon Plynlimon

Crying or Very sad  Crying or Very sad  Crying or Very sad

I thought the 09's were immune from scrapping!!

How come 021 was stopped/canibalised??
concrete bob

Pumlumon Plynlimon wrote:
How come 021 was stopped/canibalised??


I think it had problematic wheelsets. Must have been something serious for it to be out of use for so long. At the end, it was heavily canibalised, with its buffers, centre wheels and both cranks, all missing. And to round it off, the track around it, was took up when it was announced that Immingham was closing, leaving it isolated on a small set of rails.

It won't be the last 09 to be cut up either. 09016 at St. Blazey, looks like that's going to be cut up on site, maybe in the next month or so.
royalred

Is St Blazey depot being demolished??? I didn't even know it had been closed??
royalred

Regarding 09021 it was withdrawn in February 2004 at the beginning of the great shunter cull, stopped at Wabtec Doncaster where it had been undergoing/awaiting repairs prior to being deemed surplus to requirements. I believe traction motors was the problem.

Rhys

       Shunterspot forum Forum Index -> Corrections and Updates
Page 1 of 1
Create your own free forum | Buy a domain to use with your forum